We offer complete, site to final completion, planning and residential construction solutions through our tested, experienced and reputable professionals, suppliers, contractors and trades. We solve complex issues, deliver a high quality product and have a dedicated, dependable and reputable team that our residential owners can trust.

Contact Us

A Sample LandmarkAcadia Scope of Work for a New Construction Residential Build

Our residential construction product encompasses the entire life cycle of building a new home, from the initial spark of an idea to the final finishing touches and beyond.

    Our residential construction product encompasses the entire life cycle of building a new home, from the initial spark of an idea to the final finishing touches and beyond.
    I. Planning and Design
  • Initial Consultation & Vision: We begin by meeting with clients to understand their needs, preferences, budget, and desired lifestyle, transforming their vision into a functional and aesthetically pleasing blueprint.
  • Site Analysis & Selection: We conduct thorough site assessments considering zoning laws, environmental factors, soil conditions, and proximity to amenities, ensuring an optimal location for the project.
  • Architectural Design & Blueprints: Collaborating with architects and designers, we develop detailed floor plans, elevations, cross-sections, and MEP (Mechanical, Electrical, Plumbing) plans, adhering to local building codes and regulations.
  • Budgeting & Financing: We create a comprehensive budget encompassing all costs and assist clients in securing financing, managing expectations, and exploring options like construction loans.
  • Permitting & Approvals: We navigate the permitting process, securing all necessary permits and approvals from local authorities to ensure a smooth construction journey.
  • II. Construction phase
  • Site Preparation & Foundation: We clear and prepare the land, excavate for the foundation, and pour the chosen foundation type (slab, crawl space, or basement), ensuring structural integrity and proper drainage.
  • Framing: The building's skeleton takes shape as we construct the structural framework using high-quality materials like wood or steel for walls, floors, and the roof.
  • Rough-Ins (Mechanical Systems): Skilled professionals install the "behind-the-walls" elements, including plumbing pipes, electrical wiring, and HVAC duct work, ensuring optimal functionality and safety.
  • Roofing & Exterior Work: The roof is installed, and exterior doors and windows are secured, making the house "dried-in" and protected from the elements.
  • Insulation & Drywall: Insulation is installed for energy efficiency and soundproofing, followed by drywall installation, taping, mudding, and sanding to create smooth surfaces for interior finishes.
  • Interior Finishes: The home's personality comes to life with interior finishes, including painting, trim and molding, flooring installation (hardwood, tile, carpet), cabinetry, counter tops, and fixture installations.
  • Exterior Finishes: Exterior work such as siding installation, gutters, walkways, and driveway paving completes the home's outer appearance.
  • III. Post-construction
  • Final Inspections & Punch Lists: Thorough inspections are conducted to ensure code compliance and address any remaining items, creating a detailed punch list for touch-ups and adjustments.
  • Client Walk through & Handover: We walk clients through their completed home, explaining its features, warranties, and maintenance tips, culminating in a formal handover with all necessary documentation.
  • Warranty & Ongoing Support: Our commitment extends beyond project completion, including warranties on our work and offering guidance on ongoing maintenance to preserve the quality and longevity of the home.
  • Our product focuses on delivering high-quality residential construction through meticulous planning, skilled craftsmanship, efficient project management, and transparent communication, ensuring a seamless and satisfying experience for our clients.

Call 207-831-3303 to learn what our trusted residential construction team can offer you.

Design Build Project plans for new construction on Mount Desert Island, Maine
Design Build Project plans for new construction on Mount Desert Island, Maine
4,500 SqFt of T&G Sapele soffit cladding, pre-finished and installed Bar Harbor home
4,500 SqFt of T&G Sapele soffit cladding, pre-finished and installed Bar Harbor home
New Facade as part of new 3600 SqFt three story addition on Mount Desert Island residence
New Facade as part of new 3600 SqFt three story addition on Mount Desert Island residence
Custom Open Staircase in Sapele Mahogany from Spiritcraft Furniture and Great Spirit Hardwoods, East Dundee, IL
Custom Open Staircase in Sapele Mahogany from Spiritcraft Furniture and Great Spirit Hardwoods, East Dundee, IL

Custom, made to spec, architectural hardwood products enhance the eye appeal of any residential property.